{"id":1416,"date":"2017-01-19T07:55:12","date_gmt":"2017-01-19T06:55:12","guid":{"rendered":"http:\/\/www.si-hu.eu\/en2\/?p=1416"},"modified":"2017-01-19T08:33:49","modified_gmt":"2017-01-19T07:33:49","slug":"approved-projects-in-the-frame-of-the-2nd-deadline-for-submissin-of-project-applications","status":"publish","type":"post","link":"http:\/\/www.si-hu.eu\/en2\/2017\/01\/19\/approved-projects-in-the-frame-of-the-2nd-deadline-for-submissin-of-project-applications\/","title":{"rendered":"Approved projects in the frame of the 2nd deadline for submission of project applications"},"content":{"rendered":"<p><a href=\"http:\/\/www.si-hu.eu\/en2\/wp-content\/uploads\/sites\/11\/2016\/06\/approved.jpg\"><img loading=\"lazy\" class=\"alignleft wp-image-924\" src=\"http:\/\/www.si-hu.eu\/en2\/wp-content\/uploads\/sites\/11\/2016\/06\/approved.jpg\" alt=\"\" height=\"92\" width=\"221\"><\/a>In the frame of the 4th meeting of the Monitoring Committee (MC), which took place on <strong>16 January 2017 <\/strong>in Gosztola Hungary, the members of the MC approved projects that were submitted within the 2nd deadline for the submission of project proposals.<\/p>\n<p>In the frame of the 2nd&nbsp; deadline of the Open Call, 43 project applications were submitted. At the meeting the members of the MC discussed the 34 project applications that were administratively compliant and eligible assessed for quality. At the meeting, <span style=\"color: #008000;\"><strong>5 project proposals were approved<\/strong>,<\/span> further <span style=\"color: #008000;\">5 project proposals were postponed and 22 project proposals were rejected.<\/span><\/p>\n<p>The ERDF Subsidy contracts are foreseen to be signed with the Lead Partners of the approved projects in March 2017.<\/p>\n<p>Within the Priority axis 1, <span style=\"color: #008000;\"><strong>4 projects<\/strong> <\/span>in the total value of <span style=\"color: #008000;\"><strong>5.425.400,89 EUR ERDF<\/strong><\/span> were approved, namely:<\/p>\n<ul>\n<li><span style=\"color: #008000;\"><strong>GO IN NATURE<\/strong><\/span><\/li>\n<li><span style=\"color: #008000;\"><strong>IronCurtainCycling<\/strong><\/span><\/li>\n<li><span style=\"color: #008000;\"><strong>ESCAPE<\/strong><\/span><\/li>\n<li><span style=\"color: #008000;\"><strong>Guide2Visit<\/strong><\/span><\/li>\n<\/ul>\n<p>Within the Priority axis 2, <span style=\"color: #008000;\"><strong>1 project<\/strong><\/span> in the value of <span style=\"color: #008000;\"><strong>349.829,11 EUR ERDF<\/strong><\/span> was approved, namely:<\/p>\n<ul>\n<li><strong><span style=\"color: #008000;\">Right Profession II<\/span><\/strong><\/li>\n<\/ul>\n<p>Within the first and second deadline of the Open Call, funds in the amount of approx. <strong>6,6 million EUR ERDF<\/strong> or about<strong> 45%<\/strong> of all available programme funds shell be contracted.<\/p>\n<p>Decisions of the Monitoring Committee can be found <a href=\"http:\/\/www.si-hu.eu\/en2\/?page_id=1414&amp;preview=true\">here<\/a>.<\/p>\n<p><a href=\"http:\/\/www.si-hu.eu\/en2\/wp-content\/uploads\/sites\/11\/2017\/01\/rezultatiSI.jpg\"><img loading=\"lazy\" class=\"aligncenter size-full wp-image-1417\" src=\"http:\/\/www.si-hu.eu\/en2\/wp-content\/uploads\/sites\/11\/2017\/01\/rezultatiSI.jpg\" alt=\"\" height=\"325\" width=\"574\" srcset=\"http:\/\/www.si-hu.eu\/en2\/wp-content\/uploads\/sites\/11\/2017\/01\/rezultatiSI.jpg 574w, http:\/\/www.si-hu.eu\/en2\/wp-content\/uploads\/sites\/11\/2017\/01\/rezultatiSI-300x170.jpg 300w, http:\/\/www.si-hu.eu\/en2\/wp-content\/uploads\/sites\/11\/2017\/01\/rezultatiSI-450x255.jpg 450w\" sizes=\"(max-width: 574px) 100vw, 574px\" \/><\/a><\/p>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>In the frame of the 2nd deadline of the Open Call Interreg V-A SI-HU the members of the MC discussed and approved 5 project proposals, further 5 project proposals were postponed and 22 project proposals were rejected.<\/p>\n","protected":false},"author":7,"featured_media":924,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"ngg_post_thumbnail":0},"categories":[2],"tags":[],"_links":{"self":[{"href":"http:\/\/www.si-hu.eu\/en2\/wp-json\/wp\/v2\/posts\/1416"}],"collection":[{"href":"http:\/\/www.si-hu.eu\/en2\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"http:\/\/www.si-hu.eu\/en2\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"http:\/\/www.si-hu.eu\/en2\/wp-json\/wp\/v2\/users\/7"}],"replies":[{"embeddable":true,"href":"http:\/\/www.si-hu.eu\/en2\/wp-json\/wp\/v2\/comments?post=1416"}],"version-history":[{"count":8,"href":"http:\/\/www.si-hu.eu\/en2\/wp-json\/wp\/v2\/posts\/1416\/revisions"}],"predecessor-version":[{"id":1431,"href":"http:\/\/www.si-hu.eu\/en2\/wp-json\/wp\/v2\/posts\/1416\/revisions\/1431"}],"wp:featuredmedia":[{"embeddable":true,"href":"http:\/\/www.si-hu.eu\/en2\/wp-json\/wp\/v2\/media\/924"}],"wp:attachment":[{"href":"http:\/\/www.si-hu.eu\/en2\/wp-json\/wp\/v2\/media?parent=1416"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"http:\/\/www.si-hu.eu\/en2\/wp-json\/wp\/v2\/categories?post=1416"},{"taxonomy":"post_tag","embeddable":true,"href":"http:\/\/www.si-hu.eu\/en2\/wp-json\/wp\/v2\/tags?post=1416"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}